Coverart for item
The Resource Integrated cost-schedule risk analysis, David Hulett, (electronic book)

Integrated cost-schedule risk analysis, David Hulett, (electronic book)

Label
Integrated cost-schedule risk analysis
Title
Integrated cost-schedule risk analysis
Statement of responsibility
David Hulett
Creator
Subject
Language
eng
Member of
Cataloging source
MiAaPQ
http://library.link/vocab/creatorName
Hulett, David T
Dewey number
658.15/52
Index
index present
LC call number
HD69.P75
LC item number
H85 2011
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://library.link/vocab/subjectName
  • Project management
  • Costs, Industrial
  • Risk assessment
Label
Integrated cost-schedule risk analysis, David Hulett, (electronic book)
Instantiates
Publication
Bibliography note
Includes bibliographical references and index
Color
multicolored
Control code
EBC688655
Dimensions
unknown
Extent
xix, 218 p.
Form of item
  • online
  • electronic
Isbn
9780566091667
Reproduction note
Electronic resource.
Specific material designation
remote
Label
Integrated cost-schedule risk analysis, David Hulett, (electronic book)
Publication
Bibliography note
Includes bibliographical references and index
Color
multicolored
Control code
EBC688655
Dimensions
unknown
Extent
xix, 218 p.
Form of item
  • online
  • electronic
Isbn
9780566091667
Reproduction note
Electronic resource.
Specific material designation
remote

Library Locations

Processing Feedback ...